Configuring a Dedicated Offsite Copy task

Last published : Sep 28, 2026
You can assign a computer the task of copying recovery point sets from a recovery point destination to a dedicated Offsite Copy location. Configuring such a task is very efficient and powerful. Unlike specifying an Offsite Copy destination within a backup policy that may go to many computers, you use the system resources of one dedicated computer. That one dedicated computer processes an entire Offsite Copy task.
To configure a Dedicated Offsite Copy task
  1. On the Veritas System Recovery 18 Management Solution Monitor Tasks tab, right-click Veritas System Recovery Tasks , and then click New > Task.
  2. In the Client Tasks tree, click Veritas System Recovery Tasks > Dedicated Offsite Copy.
  3. On the Create New Task page, in the right pane, type a name for the task.
  4. Select the computer that you want to dedicate to the Offsite Copy task.
  5. Do one of the following:
    • Click Copy all recovery point sets.
    • Select Copy recovery point sets created by this computer , and then select the computer that you want from the drop-down list.
    • Select Copy recovery point sets that have recovery points created in the last , and then specify the number of days in the text field.
    • Click Specific recovery point sets , and then select a recovery point set based on the date it was created.
  6. Do one of the following:
    | To use an existing destination | In the Offsite Destination drop-down list, select the destination where you want the recover point sets to be copied. |
    | To create a new destination | Select Create new destination , and then specify a local folder path, a UNC path to a network share, or OpenStorage destination. |
    | | If you typed a UNC path or OpenStorage destination, you must specify the necessary user name and password credentials. |
    | | Click Add Destination . |
  7. Click OK.
  8. In the Task Status field for your dedicated Offsite Copy task, do one of the following:
    | To run the task as soon as possible | Click New Schedule . |
    | | Click Now or click Schedule at the bottom of the panel to run the task as soon as possible. |
    | To schedule a time to run the task | Click New Schedule . |
    | | Click Schedule . Specify the date and time to run the task. Click Schedule at the bottom of the panel. |