Disabling a backup schedule
You can temporarily disable the schedule of a backup so that the creation of recovery points is reduced on the resource targets that are assigned to the backup. For example, any event triggers that are associated with the backup can still cause the creation of recovery points despite the schedule being disabled.
To disable a backup schedule
-
On the Veritas System Recovery 21 Management Solution Manage Tasks tab, in the left pane, click Backup Policies.
-
In the middle panel, select a backup policy name.
-
On the toolbar, in the middle panel, click Edit.
-
In the Schedule Details field, click the associated hyperlink.
-
Do one of the following:
-
If the backup type is a recovery point set, in the Backup Policy Schedule panel, uncheck Schedule , and then click Apply.
-
If the backup type is an independent recovery point set, select No schedule ** from the drop-down list, and then clickApply**.
-
-
Click Save changes.